Survey Reporting Tool – Paginated Grid View
The Wyoming Pathways Active Transportation and Trails Community Needs Survey Reporting Tool Grid View displays the complete submission data from each respondent. The search results in this view are paginated, with 5 entries showing per page. If multiple projects were submitted by a single respondent, these are displayed as individual entries. To save these entries you can print them by using the “Print Search Results” link. If you would like the same data in a CSV format, please go to the Paginated Table View.
How to Search Survey Responses: We have provided multiple search categories to search the survey (Project Type, Trail Project Type, Nearest Town or City to project, Zip Code of Project, House District of Project, Respondent Representing and Respondent Town or City). You can search by individual or combinations of the search categories, but combining search terms will likely reduce the number of results returned.
If you find this tool useful, please consider making a donation to support our continued work to bring Active Transportation and Trail projects to Wyoming communities.
City or Town you represent: Gillette
City of Town you live in or nearest to: Lander
City, Town or County department: Development Services (Engineering)
I am interested in: Multiple Types of Active Transportation Projects, Including Trails
And specifically:
Do you want to tell us about specific projects? Yes
Project Type: Sidewalk and/or Crosswalk Networks
Project Jurisdiction: Gillette/WYDOT
Project Location (nearest Town or City or Statewide): Gillette
Project Location (description):
Access across Railroad
Zip Code of Project: 82717
Project House District: H53-Campbell County
Project Character of Work:
Complete Street Overpass with associated Roads and Pathways (Connecting Neighborhoods)
Project Cost Estimate: $20,000,000
Project Notes:
Railroad and HWY 14-16 has cut the city in half and has limited multimodal connections where the population and employment opportunities exist. This project would correct this inequity.
Additional Thoughts:
Gillette has planning complete for 23 major Pathways with some form of design.
City or Town you represent: Gillette
City of Town you live in or nearest to: Gillette
City, Town or County department: Development Services (Engineering)
I am interested in: Multiple Types of Active Transportation Projects, Including Trails
And specifically:
Do you want to tell us about specific projects? Yes
Project Type: Walkable Main Street Project
Project Jurisdiction: Gillette/WYDOT
Project Location (nearest Town or City or Statewide): Gillette
Project Location (description):
Along Hwy 14-16
Zip Code of Project: 82717
Project House District: H53-Campbell County
Project Character of Work:
Complete street project and possible road diet
Project Cost Estimate: $700,000
Project Notes:
Provides for expansion and sustainability of Historic Downtown
Additional Thoughts:
Gillette has planning complete for 23 major Pathways with some form of design.
City of Town you live in or nearest to: Lander
I am interested in: Multiple Types of Active Transportation Projects, Including Trails
And specifically:
Do you want to tell us about specific projects? Yes
Project Type: Shared Use Pathways and Greenways
Project Jurisdiction: Fremont County
Project Location (nearest Town or City or Statewide): Lander
Project Location (description):
Lander
Zip Code of Project: 82520
Project House District: H54-Fremont County
Project Character of Work:
Paved walking trail to connect the McManus Park walking path to the Mortimore Lane bike lane via Hillcrest Drive
Project Notes:
So badly needed as Hillcrest Drive is a busy road and there’s significant pedestrian traffic but the road doesn’t have a safe shoulder
City or Town you represent: Bear River
City of Town you live in or nearest to: Bear River
City, Town or County department: Public Works and Planning
I am interested in: Multiple Types of Active Transportation Projects, Including Trails
And specifically:
Do you want to tell us about specific projects? Yes
Project Type: Shared Use Pathways and Greenways
Project Jurisdiction: Town of Bear River
Project Location (nearest Town or City or Statewide): Bear River
Project Location (description):
Bear River, Wyoming
Project House District: H18-Lincoln, Sweetwater, Uinta Counties
Project Character of Work:
Develop and multi-user trail system along the Bear River within the Corporate limits using existing recreational essments
Project Cost Estimate: $250,000.00
City of Town you live in or nearest to: lander
I am interested in: Multiple Types of Active Transportation Projects, Including Trails
And specifically:
Do you want to tell us about specific projects? No






